Built for the growing contractor

Your company is growing faster than your back office.

Big contractors have staff. Now you do too.

When you’re small

You can search for bids yourself, read the packages, and keep the deadlines in your head.

When you’re huge

You hire estimators, administrators, and dedicated bid staff to watch the market for you.

When you’re growing, you’re stuck in the middle.

More classifications, more crews, more equipment, more territory and more opportunities create more back-office work — exactly when your cash may be better spent expanding field capacity.

California Bid Assistant helps close that gap. You set the parameters. Your Assistant searches the public-work sources we cover — across scattered, poorly designed agency and procurement websites — reads the bid documents, flags requirements and operational headaches, and shows you which jobs deserve your attention.

No long-term contract. Cancel anytime.
Assistant activity

What California Bid Assistant is doing for you

A quick look at the work happening behind the scenes
Opportunities checked47
Matched your parameters6
Strong matches2
Mandatory job walks flagged1
  • 2 strong matches surfaced for review
  • 1 mandatory job walk flagged before the deadline
  • 3 bids flagged for potential subcontracting or qualification issues
  • Full Bid Assistant Reports generated for promising projects
See the full Bid Assistant Report below ↓
Currently supporting

One company. One subscription. Every supported classification you hold.

California Bid Assistant currently supports growing civil and public-works contractors holding Class A General Engineering, C-8 Concrete, C-12 Earthwork & Paving, C-32 Parking & Highway Improvement, and C-34 Pipeline. If your company holds more than one, Assistant evaluates the opportunity against your full license stack — not one classification at a time.

This is where your Assistant earns its keep

See how a Bid Assistant Report helps you identify the best-fit opportunities and flag potential problems before you spend hours estimating.

The report below is an illustrative Bid Assistant Report based on common California public-work requirements. This example is written for a contractor holding only a C-12 license, so you can see how your Assistant flags scope, licensing, subcontracting, deadlines, and other issues before you commit time to a bid.

Sample Bid Assistant Report begins here
ILLUSTRATIVE BID ASSISTANT REPORT

Municipal Roadway Rehabilitation — Phase II

Example California public-works project · Composite demonstration
Assistant matchStrong — with catches
Estimated value$1.8M
Distance42 miles
Bid dueOct. 18
Mandatory walkOct. 3

Why Assistant matched it to you

  • Inside your selected 75-mile service radius
  • $1.8M falls inside your selected $250K–$2M range
  • Excavation, grading, milling, and paving match your selected work
  • Your stated bonding capacity covers the project
  • C-12 qualifies for the primary earthwork/paving scope
  • No set-aside appears to exclude you
Assistant found these before you started estimating

Mandatory job walk

Attendance required: Oct. 3.
Missing it makes you ineligible to bid. [1]

Additional licensed trades may be needed

C-8 Concrete: ADA curb-ramp work appears in the scope. [2]

C-10 Electrical: Traffic-loop work appears in the scope. [3]

C-32 Parking & Highway Improvement: Striping/signage scope should be verified. [4]

Bonding

Bid security: 10%
Performance bond: 100%
Payment bond: 100% [5]

Liquidated damages

$2,000 per day for late completion. [6]

Working restrictions

Night work required on portions of the project. Lane closures are limited to specific hours. Weekend work may be required. [7]

More requirements Assistant surfaced

Prevailing wage: Applies [8]

Certified payroll: Required [9]

Experience requirement: Three comparable public-road projects completed within the last five years [10]

Project labor agreement: Applies [11]

Environmental: Stormwater compliance and project-specific documentation required [12]

The job

Roadway rehabilitation including excavation, grading, milling, asphalt paving, ADA curb-ramp reconstruction, traffic-loop work, striping/signage, drainage adjustments, and traffic-control operations.

The core paving work is a strong fit, but the mixed scope introduces multiple subcontracting and compliance questions that should be resolved before estimating.

Pros

  • Strong match to your normal paving/earthwork scope
  • Within your selected territory
  • Within your preferred job size
  • Bonding appears within your stated capacity
  • No special set-aside appears to exclude you

Potential deal-breakers

  • Mandatory job walk — miss it and you cannot bid
  • C-12 alone may not cover every project scope
  • $2,000/day liquidated damages
  • Night work and restricted lane-closure hours
  • PLA and three-project experience requirements

Operational headaches

Mandatory site walk: Yes — attendance required

Night work: Required on portions

Weekend work: May be required

Traffic control: Contractor responsibility

Certified payroll: Required

Project labor agreement: Applies

Environmental paperwork: Required

Lane closures: Limited to specified windows

Important dates

Mandatory job walk: Oct. 3

Questions due: Oct. 8 [13]

Bid due: Oct. 18 [14]

Expected start: November

Other trades / licenses involved

C-8 Concrete: ADA curb-ramp scope [15]

C-10 Electrical: Traffic-loop work [16]

C-32 Parking & Highway Improvement: Striping/signage scope [17]

Action: Verify what you can self-perform and what must be subcontracted.

Assistant’s take

Worth reviewing — but this is not a simple paving job.

The core scope fits your parameters well. Before committing estimating time, verify your experience qualification and confirm subcontracting coverage for the concrete, electrical, and striping portions. The mandatory job walk is the immediate priority. The $2,000/day liquidated damages, night-work restrictions, PLA requirements, and lane-closure windows deserve close review before you decide to pursue.

What Assistant recommends you verify next

  1. Confirm attendance at the mandatory job walk.
  2. Check whether your three recent projects satisfy the experience requirement.
  3. Confirm bonding availability for the full contract value.
  4. Line up subcontractor coverage for C-8, C-10, and C-32 scope if needed.
  5. Review the PLA, night-work, and lane-closure requirements with your crew.
  6. Open the latest addenda before final pricing.

Sources & Verification

Key findings in this sample are tied back to the bid documents so you can verify them quickly without interrupting the flow of the report.

  • [1] Instructions to Bidders, p. 7
  • [2] Technical Specifications — Concrete Improvements, p. 118
  • [3] Electrical / Traffic Signal Notes, p. 164
  • [4] Striping & Signage Specifications, p. 171
  • [5] Bid Security & Bonds, p. 12
  • [6] Special Conditions §8.4, p. 42
  • [7] Traffic Control / Work Hours, p. 89
  • [8] General Conditions — Prevailing Wage, p. 31
  • [9] Labor Compliance Requirements, p. 34
  • [10] Bidder Qualifications, p. 18
  • [11] Project Labor Agreement, p. 56
  • [12] Environmental & Stormwater Requirements, p. 132
  • [13] Notice Inviting Bids / Procurement Schedule, p. 3
  • [14] Notice Inviting Bids, p. 1
  • [15] Technical Specifications — Concrete Improvements, p. 118
  • [16] Electrical / Traffic Signal Notes, p. 164
  • [17] Striping & Signage Specifications, p. 171

Source documents your Assistant checked

Official solicitation
Plans
Specifications
Addendum 1
Addendum 2
Bidder Q&A

End of illustrative sample report. This example is based on common California public-work requirements and is meant to show the depth of the analysis. California Bid Assistant helps you screen opportunities faster, but you should still review the official solicitation, plans, specifications, addenda, and agency requirements before submitting a bid.

End of sample Bid Assistant Report
The details that make or break a bid

What California Bid Assistant checks for you

Public-work opportunities are scattered across state, county, city, school district, utility, and procurement websites. California Bid Assistant checks those sources for you so you don’t have to keep hunting from site to site.

Your Assistant pulls out what matters and flags potential problems before you spend hours digging through the bid package yourself.

Basic opportunity informationProject, agency, location, distance, scope, estimated value, deadlines, expected start, and duration.
EligibilityRequired license or classification, whether your company’s license stack qualifies, DIR registration, prequalification, certifications, and experience requirements.
Money & riskBid, payment and performance bonds, insurance, prevailing wage, liquidated damages, payment terms, and contract structure.
Operational headachesJob walks, night/weekend work, traffic control, environmental requirements, Buy America, certified payroll, PLAs, and tight schedules.
Built for the growing contractor

The kind of bid support bigger contractors can afford — without the cost of full-time staff.

One straightforward plan. No artificial tiers. No long-term contract.

Everything included
$39.99 / month

One company. One subscription. All supported classifications you hold.

Less than $10 a week.

14-day free trial Personalized bid matching Bid Assistant Reports on promising projects No long-term contract Cancel anytime
Start your 14-day free trial
Simple by design

How it works

1

Set your parameters

Choose the projects, locations, sizes, and requirements you want.

2

California Bid Assistant watches

Assistant checks the public-work sources we cover.

3

Assistant reads

Promising opportunities are reviewed for the details that matter.

4

You get the report

See the pros, cons, risks, deadlines, requirements, and headaches.

5

You decide

Open the official bid and start your normal estimating process.

Peace of mind

Make sure the right job doesn’t slip through the cracks.

Finding a great public project a day after the mandatory job walk doesn’t do you much good. Assistant surfaces deadlines, meetings, site walks, and other requirements that can make you ineligible if you miss them.

Spend less time searching — without worrying that the perfect job is sitting somewhere you never thought to look.

Less searching. Better decisions.

Stop hunting. Start reviewing.

You shouldn’t have to spend your evenings searching scattered government websites, opening long bid packages, and figuring out whether a project is even worth considering.

01

You set the parameters

Work types, service area, project size, bonding limits, scheduling preferences, and other deal-breakers.

02

California Bid Assistant watches

California Bid Assistant continuously checks the public-work sources we cover for opportunities that fit those parameters.

03

Assistant reads

Promising bids are reviewed for scope, eligibility, money, risk, deadlines, and operational headaches.

04

You decide

Get the important details first, then decide whether the official bid package deserves your estimating time.